finance
Lumper Receipt Match Rate Study 2026
A reconciliation study for lumper receipts and settlement deductions.
Trucking VA Research Team · · 1 min read · 5 sources

Table of contents6 sections
Key takeaways
- Match on load number, not amount alone.
- Track missing receipts and unapproved fees separately.
- Review repeat vendors and repeat shortfalls.
Published October 22, 2026.
The question
What share of lumper receipts match the load and the settlement, and where do they fail?
Method
Sample 100 lumper transactions. Record the load, receipt, approval, settlement, and exception reason.
| Measure | Definition | Source | Limit |
|---|---|---|---|
| Event time | When the event occurred | System timestamp | Clock drift |
| Response time | From request to usable answer | Log | Missing events |
| Completion | Evidence that the step closed | Document | Self-report |
| Exception | Reason the step did not close | Note | Inconsistent codes |
Interpretation
Report the median and the tail. Separate Missing events from late events. Do not turn a local observation into a national benchmark.
Limits
Receipts held by drivers or brokers may arrive after the study window.
Operational use
Choose one change, set a review date, and keep the method stable for the next comparison.
Sources
Sources and citations
- https://www.fmcsa.dot.gov/regulations, retrieved 2026-10-22
- https://ops.fhwa.dot.gov/freight/freight_analysis/perform_meas/index.htm, retrieved 2026-10-22
- https://www.bts.gov/freight-facts-and-figures, retrieved 2026-10-22
- https://www.osha.gov/trucking, retrieved 2026-10-22
- https://www.ftc.gov/business-guidance/resources/protecting-personal-information-guide-business, retrieved 2026-10-22